Electromagnetic optical shutter with movable permanent magnet and integrated aperture
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Mar 4, 2025
Grant Date -
Dec 14, 2023
app pub date -
Jun 9, 2022
filing date -
Jun 9, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
This patent document provides optical shutter devices based on electromagnetically activated shutters using a printed circuit board (“PCB”) structure to provide a coil that generates a magnetic field to move a permanent magnet in and out of an optical aperture integrated as part of the PCB structure to open and close the passage of light through the optical aperture.
First Claim
all claims..Other Claims data not available
Family
Country | kind | publication No. | Filing Date | Type | Sub-Type |
---|
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- OCEAN OPTICS, INC.
International Classification(s)

- 2022 Application Filing Year
- H02K Class
- 2937 Applications Filed
- 1114 Patents Issued To-Date
- 37.93 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
McGee, Brian | Orlando, US | 12 | 334 |
# of filed Patents : 12 Total Citations : 334 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H02K Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 4, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 4, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 4, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
