Energy supply system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12244149
APP PUB NO 20230170702A1
SERIAL NO

17916039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy supply system, which is a system constituting a regional power system in a target region, includes a power transmission system including a first power generation facility and a second power generation facility, a power transmission and distribution system that supplies power to each consumer, a management system, and an unmanned flying object. The unmanned flying object has a transport function of transporting a cargo and a power supply function of supplying power to an outside. When the amount of power supplied by the power transmission system is less than the amount of power required by the power transmission and distribution system, the management system performs a power adjustment process of supplying power from the unmanned flying object to the power transmission and distribution system by using the power supply function of the unmanned flying object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KAWASAKI JUKOGYO KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hakamada, Kazuhide Kobe, JP 14 11
Hanamitsu, Akira Kobe, JP 4 2
Kondo, Koki Kobe, JP 2 1
Sakagawa, Keiji Kobe, JP 12 6
Tanimura, Kazuhiko Kobe, JP 12 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00