Connector arrangement for connecting heatable fluid lines

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12241579
APP PUB NO 20210140577A1
SERIAL NO

16970221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector arrangement for connecting heatable fluid lines including at least one first coupling component and at least one second coupling component. The first coupling component and the second coupling component being connectable to each other, and each including at least one first fluid line, at least one first fluid line interface, at least one first electrical conductor, and at least one first electrical interface. The second coupling component includes at least one second fluid lien, and at least one of the first and second coupling components includes at least one fluid line splitter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VOSS AUTOMOTIVE GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baensch, Andreas Pulheim, DE 1 1
Häger, Daniel Wipperfürth, DE 1 1
Heinrichs, Eugen Bergneustadt, DE 12 55
Hess, Jochem-Andreas Wipperfürth, DE 10 41
Isenburg, Marco Ratingen, DE 18 193
Röhrig, Lukas Marienheide, DE 6 14
Sachse, Martin Wipperfürth, DE 5 21
Wilms, Waldemar Marienheide, DE 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00