Cellulose fiber composite recycled resin and production method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240966
APP PUB NO 20220204739A1
SERIAL NO

17607578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cellulose fiber composite recycled resin having excellent strength, and a method for producing the same. The cellulose fiber composite recycled resin contains a recycled resin and a mixture of fibrous cellulose, at least one of resin powders and resin pellets, and at least one substance selected from the group consisting of phthalic acid, phthalates, derivatives of phthalic acid, and derivatives of phthalates. For producing this composite resin, at least one of resin powders and resin pellets are added to a slurry of cellulose fibers to obtain a first mixture, a recycled resin is mixed into the first mixture to obtain a second mixture, and the second mixture is kneaded, wherein part or all of the cellulose fibers are fine fibers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIO PAPER CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsusue, Ikko Ehime, JP 17 20
Ochiai, Yu Ehime, JP 8 0
Okawa, Junya Ehime, JP 9 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00