Method for manufacturing nitrile-based rubber, nitrile-based rubber manufactured thereby, and rubber composition comprising same rubber

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240931
APP PUB NO 20220089801A1
SERIAL NO

17422254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a preparation method of a nitrile-based rubber, a nitrile-based rubber prepared therefrom, and a rubber composition including the nitrile-based rubber, and the nitrile-based rubber has a low content of a residual emulsifier and excellent mechanical physical properties by using a emulsifier mixture including a first emulsifier including a sulfosuccinate ester-based compound, and a second emulsifier including a fatty acid or a metal salt thereof, or a rosin acid or a metal salt thereof, each of which has 12 to 18 carbon atoms and a monocarboxyl group, wherein the first emulsifier and the second emulsifier are included at a weight ratio of 2:1 to 6:1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Woo Seok Daejeon, KR 32 35
Kim, Byoung Yun Daejeon, KR 23 239
Lee, Jae Min Daejeon, KR 193 572
Lee, Se Eun Daejeon, KR 13 23
Son, Sung Min Daejeon, KR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00