Vehicle control method and vehicle drive system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240334
APP PUB NO 20220289033A1
SERIAL NO

17689225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a vehicle control method for controlling a capacitance ripple and a torque ripple of a vehicle drive system, wherein the vehicle drive system comprises a first DC-DC convertor. The vehicle control method comprises utilizing a first three-phase inverter circuit of a motor control device of the vehicle drive system as a first switching circuit of the first DC-DC convertor; utilizing a first three-phase winding of a motor of the vehicle drive system as a first three-phase inductor of the first DC-DC convertor; utilizing a pulse width modulation controller of the vehicle drive system for modulating a first three-phase current outputted by the first switching circuit to generate a first three-phase carrier wave; and setting a first phase difference of each phase of the first three-phase carrier wave for controlling the capacitance ripple and the torque ripple.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHANGHAI XPT TECHNOLOGY LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Wencheng Hefei, CN 3 3
Wang, Kai Hefei, CN 565 3689

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00