Hammer assembly for a power tool

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12240092
SERIAL NO

18457657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hammer assembly for a power tool. The hammer assembly provides a first, proximal engagement portion couplable directly to a backside of the power. A second, distal engagement portion is directly connected to the first engagement portion. A head portion is directly connected to the second engagement portion. The second engagement portion provides one or more chambers, each chamber housing a spring for storing energy imparted by compressive forces against the head portion. Each spring directly interconnecting the first and second engagement portions through an open side of the chamber facing the first engagement portion. There is a gap between the first and second engagement portions, between their respective distal and proximal surface, which is spanned by the spring, enabling the latter to deflect before said surfaces contact under compressive loading.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Owner owned or assignment not recorded

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alzoubi, Ayham Samir Slidell, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00