Laminated rotor core for a rotor, and method for producing a laminated rotor core

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12237722
APP PUB NO 20220337106A1
SERIAL NO

17639756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laminated rotor core for a rotor of a permanently excited electric machine and to a method for producing same are provided. The laminated rotor core consists of a plurality of stacked lamination rings, each lamination ring consisting of a plurality of circular segments. Each circular segment has multiple receiving openings, which are arranged in a V-shaped manner relative to each other in pairs, for permanent magnets and multiple passages for respective fixing elements. The laminated rotor core is mounted on a holding disc using the fixing elements, which run in the passages of the laminated rotor core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SCHAEFFLER TECHNOLOGIES AG & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schlosser, Michael Bietigheim, DE 14 50
Schwenk, Wilfried Achern-Mösbach, DE 5 14
Wisbar, Patrick Rastatt, DE 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00