Receptacle connector with flexible insertion directions

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12237619
APP PUB NO 20220376439A1
SERIAL NO

17695504

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A receptacle connector includes an insulating portion, a receptacle terminal module mounted to the insulating portion, a metal shell enclosing the insulating portion, and a receptacle circuit board. The insulating portion includes a receiving space and a mating space extending from the receiving space. The mating space extends through the insulating portion to form a mating port. The receptacle terminal module includes a first terminal module and a second terminal module. The first terminal module and the second terminal module have a same structure, and are symmetrically arranged on opposite sides of the mating space. The first terminal module and the second terminal module are electrically connected to the receptacle circuit board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DONGGUAN LEADER PRECISION INDUSTRY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Jinqi Dongguan, CN 24 3
Wan, Jiamei Dongguan, CN 3 0
Wang, Bo Dongguan, CN 734 4273

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00