Methods of generating circuit models and manufacturing integrated circuits using the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12236178
APP PUB NO 20220121800A1
SERIAL NO

17503558

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of generating a circuit model used to simulate an integrated circuit may include generating first feature element data and second feature element data by classifying feature data of a target semiconductor device according to measurement conditions, generating first target data and second target data by preprocessing the first feature element data and the second feature element data, respectively, generating a first machine learning model using the first target data and extracting a second machine learning model using the second target data, and generating the circuit model used to simulate the integrated circuit using the first machine learning model and the second machine learning model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Changwook Hwaseong-si, KR 28 43
Kim, Yohan Gwacheon-si, KR 53 357
Ryu, Jisu Hwaseong-si, KR 12 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00