Data backup device control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12235733
APP PUB NO 20240264909A1
SERIAL NO

18690985

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Data backup method, wherein the method comprises the following method steps:

    switching on an energy supply of a first data storage element of a data backup device by means of a control unit of the data backup device,activating a processing unit by means of the control unit,setting up a data connection between the processing unit and the first data storage element,setting up a data connection between the processing unit and a data memory,querying the data memory by means of the processing unit,storing the data queried from the data memory on the data storage element by means of the processing unit,deactivating the processing unit,switching off an energy supply of the first data storage element by means of the control unit, and data backup device for such a method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schweppenhauser, Moritz Herdwangen-Schonach, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00