Signal generator, method of generating signal, and display device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12235675
APP PUB NO 20240264628A1
SERIAL NO

18637461

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A signal generator may include a reference horizontal synchronization signal generation block which generates reference horizontal synchronization signals based on a number of clock signals per a horizontal time, a frame clock calculation block which calculates a first frame clock number based on a number of the clock signals per the horizontal time, a frame clock comparation block which calculates a clock offset by comparing the first frame clock number and a second frame clock number generated based on a number of the clock signals per a frame time, a clock distribution block which generates horizontal synchronization signals by distributing a number of the clock signals corresponding to the clock offset to the reference horizontal synchronization signals, and a vertical synchronization signal generation block which generates a vertical synchronization signal based on the horizontal synchronization signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG DISPLAY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chae, Se-Byung Seongnam-si, KR 21 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00