Radiation detector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12235397
APP PUB NO 20220140244A1
SERIAL NO

17460942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a radiation detector includes a first layer, a first conductive layer, a second conductive layer, and an organic semiconductor layer. The first layer includes a first organic substance. The first layer emits light based on beta rays incident on the first layer. A period from a time of a maximum value of an intensity of the light until the intensity of the light drops to 1/2.72 of the maximum value is not less than 10 ns. The second conductive layer is located between the first layer and the first conductive layer. The organic semiconductor layer is located between the first conductive layer and the second conductive layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aiga, Fumihiko Kawasaki, JP 63 419
Nakayama, Kohei Kawasaki, JP 41 80
Nomura, Yuko Kawasaki, JP 45 279
Takasu, Isao Setagaya, JP 61 298
Wada, Atsushi Kawasaki, JP 181 1072

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00