Shock initiation of non-electric shock tube

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12235089
SERIAL NO

18164772

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the disclosure are directed to a shock initiation system for initiating shock in a shock tube for demolition. In some embodiments, the shock initiation system comprises a reusable discharge unit and a replaceable shock initiation platform. The reusable discharge unit may comprise a power source, a timer, a switch, and user inputs and may function to store a time, countdown the timer, and generate and transmit an electrical energy to the replaceable shock initiation platform. The shock initiation platform may receive the electrical energy from the discharge unit overpowering a resistor disposed on the shock initiation platform. The resistor may then detonate providing an initiation shock to a proximally disposed shock tube, thereby initiating shock in the shock tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heffernan, Paul Thomas Fairway, US 1 0
Vance, Joshua Dale Peculiar, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00