Pressure vessel assembly and pressure vessel protector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234948
APP PUB NO 20230304633A1
SERIAL NO

17874916

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressure vessel assembly includes a pressure vessel including a cylinder, a first side dome provided at one end of the cylinder, and a second side dome provided at the other end of the cylinder, a first protector that surrounds an outer surface of the first side dome, a second protector that surrounds an outer surface of the second side dome, and a connector that connects the first protector and the second protector such that the pressure vessel is interposed between the first protector and the second protector. The pressure vessel assembly can help to prevent damage and breakage of the pressure vessel caused by external impact and improve safety and reliability of the pressure vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Cheol Hwan Yongin-si, KR 53 261
Yoo, Seon Woo Ulsan, KR 11 211

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00