Thermal energy storage system coupled with steam cracking system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234751
APP PUB NO 20240247597A1
SERIAL NO

18587847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy storage system (TES) converts variable renewable electricity (VRE) to continuous heat at over 1000° C. Intermittent electrical energy heats a solid medium. Heat from the solid medium is delivered continuously on demand. Heat delivery via flowing gas establishes a thermocline which maintains high outlet temperature throughout discharge. The delivered heat which may be used for processes including power generation and cogeneration. In one application, the energy storage system provides higher-temperature heat to a steam cracking furnace system for converting a hydrocarbon feedstock into cracked gas, thereby increasing the efficiency of the temperature control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RONDO ENERGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferhani, Yusef Desjardins Menlo Park, US 46 33
Jonemann, Matthieu Redwood City, US 41 86
O'Donnell, John Setel Oakland, US 69 462
Ratz, Robert San Jose, US 36 33
Treynor, Chiaki Berkeley, US 45 70
Von, Behrens Peter Emery Oakland, US 82 776

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00