Construction method for flood storage area ecological wetland oriented to multi-target collaborative promotion

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234617
SERIAL NO

18811847

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The provided is a construction method for a flood storage area ecological wetland oriented to multi-target collaborative promotion. The construction method includes: I. carrying out ecological wetland construction on a flood storage area by taking promotion of agricultural production as a goal; II. according to a water purification target of the flood storage area of the ecological wetland and a current pollution condition in the flood storage area, constructing the ecological wetland based on improvement of the water purification target when the flood storage area does not reach the water purification target at present; and III, in order to improve the biodiversity, carrying out the following ecological wetland construction on the flood storage area. In the method, agricultural production, water purification and biodiversity improvement of the flood storage area are comprehensively considered. The method is the most effective way for multi-target collaborative promotion of the flood storage area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ANHUI SURVEY & DESIGN INSTITUTE OF WATER RESOURCES & HYDROPOWER CO., LTD.; CHANGJIANG WATER RESOURCES PROTECTION INSTITUTE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Zhiyuan Hefei, CN 42 2860
Jiang, Bo Wuhan, CN 145 667
Li, Junfeng Hefei, CN 105 633
Li, Tao Hefei, CN 743 4256
Li, Zhenxin Hefei, CN 3 1
Wang, Siji Hefei, CN 1 0
Wang, Xiaoyuan Wuhan, CN 58 89
Xie, Santao Hefei, CN 1 0
Yu, Ting Hefei, CN 71 752
Zhang, Fengchan Hefei, CN 1 0
Zhang, Xinyi Hefei, CN 23 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00