Process for making a laundry detergent composition

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12234427
APP PUB NO 20220049194A1
SERIAL NO

17513983

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for preparing a solid free-flowing particulate laundry detergent composition, wherein the process includes the steps of: (a) forming a mixture by contacting: (i) molten fatty acid; (ii) liquid alkaline ingredient, and (iii) non-ionic surfactant, to obtain a mixture, wherein the mixture includes: (i) partially neutralized fatty acid component; (ii) non-ionic surfactant; and (iii) water, wherein the molar ratio of fatty acid to liquid alkaline ingredient contacted together in step (a) is above 1:1; (b) contacting the mixture obtained in step (a) to a detergent powder to form a solid free-flowing particulate laundry detergent composition, wherein in step (b) the mixture is contacted to the detergent powder by spraying the mixture at a temperature of greater than 50° C. onto the detergent powder, wherein the detergent powder includes a detergent ingredient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE PROCTER & GAMBLE COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmadian, Hossein Newcastle upon Tyne, GB 4 2
Duckitt, Claire Louise Newcastle upon Tyne, GB 1 0
Gould, Paul Anthony Newcastle upon Tyne, GB 25 97
Robles, Eric San Jose Newcastle upon Tyne, GB 33 121
Tantawy, Hossam Hassan Northumberland, GB 74 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00