Hybrid all-wheel-drive vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233875
APP PUB NO 20240217519A1
SERIAL NO

17928820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When the operation amount of an accelerator exceeds a predetermined value at a time of climbing over a bump with either one of right and left front wheels, a HEV-CU increases the regenerative torque of a first motor generator, reduces the output torque of a second motor generator, and increases the engagement force of a LSD clutch of a center differential unit so as to reduce the input torque of a front LSD. When the operation amount of the accelerator exceeds the predetermined value at a time of climbing over a bump with either one of left and right rear wheels, the HEV-CU increases the regenerative torque of the first motor generator, reduces the output torque of the second motor generator, and reduces the engagement force of the LSD clutch so as to reduce the input torque of the rear LSD.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUBARU CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higuchi, Katsuya Tokyo, JP 5 3
Nabeshima, Akihiro Tokyo, JP 36 136
Oowada, Norio Tokyo, JP 14 78
Takami, Masaki Tokyo, JP 3 3
Tatekawa, Hiroshi Tokyo, JP 5 4
Yoneda, Takeshi Tokyo, JP 56 618

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00