Method and system for kinetic energy recovery in a hybrid powertrain during engine shutdown

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233840
APP PUB NO 20230398974A1
SERIAL NO

18239610

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid powertrain system includes: an engine; a motor/generator (“MG”); a clutch coupled to the engine and the MG; a transmission coupled to the MG; an energy storage system connected to the MG; and a controller coupled to the engine, the MG, the clutch, the transmission and the energy storage system. The controller is configured to initiate an engine stop, allow engine torque and MG torque to reduce to zero or near zero, shift the transmission to a neutral gear, cause the MG to operate in a generator mode, thereby loading the engine to recover kinetic energy from the engine, disengage the clutch to decouple the MG from the engine, increase the speed of the MG to a target speed, and shift the transmission into gear in response to the MG reaching the target speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CUMMINS INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Ming-Feng Nashville, US 89 566
Snyder, David B Greenwood, US 15 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00