Optimized power distribution to transport climate control systems amongst one or more electric supply equipment stations

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233683
APP PUB NO 20240034119A1
SERIAL NO

18484840

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for optimizing power distribution amongst one or more electrical supply equipment stations at a power distribution site is provided. The method includes obtaining infrastructure data about the power distribution site, obtaining vehicle/transport climate control system data from one or more transport climate control systems and one or more vehicles demanding power from the one or more electrical supply equipment, and obtaining external data from an external source that can impact power demand from the one or more transport climate control systems. Each of the one or more transport climate control systems configured to provide climate control within a climate controlled space. The method also includes generating an optimized power distribution schedule based on the infrastructure data, the vehicle/transport climate control system data and the external data, and distributing power to the one or more transport climate control systems based on the optimized power distribution schedule.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THERMO KING LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Augenstein, Eckardt Essen, DE 7 3
Gorski, Matthias Bochum, DE 12 4
Hubbard, Wallace Stephen Chanhassen, US 13 42
Lavrich, Philip Lewis Mooresville, US 15 56
Schumacher, Ryan Wayne Bloomington, US 63 272
Srnec, Matthew Minnetonka, US 47 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00