Hydrogen gas supply apparatus and hydrogen gas supply method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12233377
APP PUB NO 20220161183A1
SERIAL NO

17441499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen gas supply apparatus includes a compressor configured to compress hydrogen gas and supply the compressed hydrogen gas toward a pressure accumulator which accumulates the hydrogen gas, a first adsorption column disposed between the discharge port of the compressor and the pressure accumulator and configured to include the first adsorbent for adsorbing impurities in the hydrogen gas discharged from the compressor, a first valve disposed between the discharge port of the compressor and the gas inlet port of the first adsorption column, a second valve disposed between the gas outlet port of the first adsorption column and the pressure accumulator, a return pipe configured to branch from between the first valve and the gas inlet port of the adsorption column and connect to the suction side of the compressor, and a second adsorption column disposed in the middle of the return pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ENEOS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuoka, Motoyoshi Tokyo, JP 1 2
Maehara, Kazumi Tokyo, JP 1 2
Seike, Tadashi Tokyo, JP 15 20
Tateishi, Daisaku Tokyo, JP 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00