C-arm X-ray device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12232904
APP PUB NO 20230000457A1
SERIAL NO

17781171

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a C-arm X-ray apparatus, which includes a C-arm translation assembly, a support column, a base, a counterweight, and an adjustment device, wherein one end of the support column is connected to the base, and the other end of the support column is slidably connected to the C-arm translation assembly; the counterweight is slidably connected to the base; and the adjustment device is connected to the counterweight, and configured to drive the counterweight to move by a preset distance in a direction opposite to a first direction in the case that the C-arm translation assembly moves in the first direction, such that a gravity center of the C-arm X-ray apparatus remains at a preset position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BOE TECHNOLOGY GROUP CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tian, Chunlei Beijing, CN 2 6
Yao, Bingyi Beijing, CN 1 5
Zhang, Xianglei Beijing, CN 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 25, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00