Switch device for a distribution network fed by more than one independent power source

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12230963
APP PUB NO 20230138521A1
SERIAL NO

17960273

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switch device includes: a resettable switching apparatus, the resettable switching apparatus is configured control an electrical connection between a first electrical feeder of an electrical distribution network and a load; and a controller configured to: cause a test signal to be provided to the first electrical feeder; determine, after a test signal is provided to the first electrical feeder, whether the electrical distribution network has a radial structure; and if the electrical distribution network has a radial structure, open the resettable switching apparatus to disconnect the load from the first electrical feeder of the electrical distribution network. The electrical distribution network receives alternating current (AC) electrical power from at least two independent AC power sources.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EATON INTELLIGENT POWER LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gajare, Swaroop Cranberry Township, US 8 4
Ghassempour, Aghamolki Hossein Edina, US 8 0
Kolge, Amit Govind Pune, IN 6 2
Thomas, Amal Changanassery, IN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00