Systems and methods for rapidly responding to commanded power profiles

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12230958
APP PUB NO 20220037916A1
SERIAL NO

17274980

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling a distributed power system is provided, the system including an aggregator communicatively coupled to a plurality of nodes, each of the plurality of nodes including an associated load. The method includes receiving, at the aggregator, a commanded power profile from an independent service operator, the commanded power profile including a commanded power deviation for the distributed power system, calculating, using the aggregator, a score for each of the plurality of nodes based on a current operating power of each node, selecting, using the aggregator, a subset of the plurality of nodes based on the calculated scores, and commanding, using the aggregator, each node in the subset to adjust its current power by a respective predetermined amount, the predetermined amounts determined based on the commanded power deviation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GE DIGITAL HOLDINGS LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbaszadeh, Masoud Clifton Park, US 56 629
Bonanni, Pierino Gianni Loudonville, US 37 478
Ghaemi, Reza Watervliet, US 17 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00