Integrated circuit, front-end module, and communication apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12230591
APP PUB NO 20230387048A1
SERIAL NO

18233459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit (IC) includes a first switch, a second switch, and an amplifier electrically connected between the first switch and the second switch. An RF signal path passes through first switch, the amplifier, and the second switch in this order. The IC includes an input terminal and an output terminal that are to be connected to each other between the first switch and the amplifier or between the amplifier and the second switch outside of the IC with a component connected therebetween. In a top view of the IC, a first region of the first switch, a second region of the amplifier, and a third region of the second switch are disposed on a straight line such that a virtual straight line connects any point of the first region, any point of the second region, and any point of the second region in this order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MANUFACTURING CO LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishikawa, Hiroshi Nagaokakyo, JP 224 3351

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00