Bridge chip, semiconductor storage device, and memory system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12230353
APP PUB NO 20230420004A1
SERIAL NO

18177955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bridge chip includes a first selection circuit, a second selection circuit, and a control circuit. The first selection circuit determines an output destination of input data and an input flag indicating whether the input data is valid or invalid based on a first selection signal. The second selection circuit determines an output destination of the input data and the input flag output from the first selection circuit based on a second selection signal. The control circuit generates the first selection signal and the second selection signal, and outputs the first selection signal and the second selection signal to the first selection circuit and the second selection circuit, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KIOXIA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shiraishi, Mikio Yokohama Kanagawa, JP 75 811

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00