Integrated circuit having lanes interchangeable between clock and data lanes in clock forward interface receiver

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12229064
APP PUB NO 20230195663A1
SERIAL NO

18172863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit in a transmitter includes a multi-lane interface, N signal generating circuits, a lane selection circuit and a control circuit. The multi-lane interface has N lanes. M of the N signal generating circuits are configured to generate M clock signals respectively. (N-M) of the N signal generating circuits are configured to generate (N-M) data signals respectively. The lane selection circuit is configured to select M of the N lanes as M clock lanes by coupling the M clock signals to the M clock lanes respectively, and couple one of the (N-M) data signals to one of remaining (N-M) lanes, serving as (N-M) data lanes, according to a data select signal. The control circuit is configured to generate a data select signal according to a lane identifier of the one of the (N-M) lanes. The data select signal has a signal value mapping to the lane identifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • M31 TECHNOLOGY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Ching-Hsiang Hsinchu, TW 51 139
Lu, Yueh-Chuan Hsinchu, TW 8 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00