Light control device, management method for light control device, and production method for light control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228834
APP PUB NO 20210072572A1
SERIAL NO

17098869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light control device including a light control sheet including a light control layer switchable between at least a first state and a second state by changing alignment of liquid crystal molecules by application of a drive voltage, and transparent electrode layers sandwiching the light control layer. The light control layer is transparent in the first state and turbid in the second state. The light control layer is in the second state when there is no application of the drive voltage. When the light control layer is in the second state, the light control sheet has a transmitted image definition of 70% or less, where the transmitted image definition is based on JIS K 7374:2007 with an optical comb width set to 0.125 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOPPAN PRINTING CO LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higashi, Yusuke Taito-ku, JP 27 251
Yamada, Takehiro Taito-ku, JP 12 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00