Liquid crystal multilayer film and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228758
APP PUB NO 20220381959A1
SERIAL NO

17765896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer film and a preparation method thereof is provided, and belongs to the technical field of optical films. The provided multilayer film comprises an ultraviolet blocking material and a cholesteric liquid crystal layer. The cholesteric liquid crystal layer comprises a polymerizable liquid crystal monomer, a polymerizable chiral dopant and a photoinitiator. The multilayer film can filter ultraviolet rays and near infrared rays in natural light, thereby reducing the heat effect of the natural light and harms of the ultraviolet rays to people and objects. In addition, the multilayer film has a high visible light transmission rate, which does not distort the color of the natural light passing through.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHENZHEN GUOHUA OPTOELECTRONICS CO., LTD.; CLIMAD TECHNOLOGY B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Xiaowen Guangdong, CN 25 200
Kragt, Augustinus Jozef Johannes Nijmegen, NL 2 0
Zhou, Guofu Guangdong, CN 152 2122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00