Combustion section with a primary combustion chamber and a secondary combustion chamber

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228286
SERIAL NO

18477597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion section of a turbine engine having a primary combustion chamber and a secondary combustion chamber. The primary combustion chamber is defined, at least in part, by a combustor liner and a dome wall. A primary fuel nozzle having an outlet is located at the dome wall, wherein the outlet of the primary fuel nozzle is fluidly coupled with the primary combustion chamber. At least one opening located in an outer liner axially aft of the dome wall fluidly couples the secondary combustion chamber and the primary combustion chamber. A set of secondary fuel nozzles are fluidly coupled with the secondary combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 NEUMANN WAY MAIL DROP F16 EVENDALE OH 45215-6301

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benjamin, Michael A Cincinnati, US 116 710
Chiranthan, R Narasimha Bengaluru, IN 30 20
Cooper, Clayton S Loveland, US 38 50
Naik, Pradeep Bengaluru, IN 143 287
Nath, Hiranya Kumar Bengaluru, IN 33 55
Vise, Steven C Loveland, US 45 64
Vukanti, Perumallu Bengaluru, IN 85 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00