Gas turbine fuel nozzle having an inner air passage and plural outer fuel passages

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228282
APP PUB NO 20240183536A1
SERIAL NO

18409690

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine can utilize a combustor to combust fuel to drive the engine. A fuel nozzle assembly can supply fuel to the combustor for combustion or ignition of the fuel. The fuel nozzle assembly can include a swirler and a fuel nozzle to supply a mixture of fuel and air for combustion. The fuel nozzle can include both a primary and secondary fuel passage, and an additional air passage to provide for greater flame control, fuel provision, or local fuel and air mixing prior to combustion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GENERAL ELECTRIC COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benjamin, Michael A Cincinnati, US 116 710
Bucaro, Michael T Arvada, US 41 21
Chiranthan, R Narasimha Bengaluru, IN 30 20
Cooper, Clayton Stuart Loveland, US 48 227
Giridharan, Manampathy G Evendale, US 51 773
Naik, Pradeep Bengaluru, IN 143 287
Patra, Ajoy Bengaluru, IN 52 37
Venkatesan, Krishnakumar Niskayuna, US 14 113
Vise, Steven C West Chester, US 45 64
Vukanti, Perumallu Bengaluru, IN 85 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00