Reconfigurable hybrid solar gas turbine system operating in a semi-open cycle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12228070
APP PUB NO 20240167416A1
SERIAL NO

18280231

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reconfigurable hybrid solar gas turbine system includes a turbocharger (TC), a gas turbine engine, and a solar energy module. The TC and engine each include a compressor and a turbine joined by a turboshaft. The engine further includes a burner, a mixer, a generator, and a flow control valve. The system operates in a semi-open cycle in which the TC receives inlet ambient air. The burner receives pressurized air from the TC and fuel, for example from an NG source. The mixer combines hot gas flows from both the burner and the solar energy module to form a combined flow, whose mixing ratio is determined by a position of the flow control valve, thereby reconfiguring the system in response to variations in incident solar irradiance. Electrical power is generated by the engine generator and an optional TC generator. The engine and/or solar energy module may include a recuperator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TURBOGEN LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lior, David Herzliya, IL 12 130

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00