Methods for electrochemical additive manufacturing of parts

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227862
APP PUB NO 20240271304A1
SERIAL NO

18583656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrochemical additive manufacturing method includes positioning a cathode portion of a build plate and a deposition anode array into an electrolyte solution. The method additionally includes transmitting electrical energy from the power source through one or more deposition anodes, through the electrolyte solution, and to the cathode portion such that material is deposited onto the cathode portion. The build plate includes a thermal feature, the deposited material is thermally coupled with the thermal feature, and the deposited material forms a heat wicking feature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FABRIC8LABS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edmonds, Andrew Oceanside, US 31 113
Herman, Jeffrey Solana Beach, US 61 2175
Matthews, Michael Encinitas, US 23 128
Pain, David Carlsbad, US 42 160
Pateros, Charles Carlsbad, US 25 145
Shaik, Kareem San Diego, US 4 1
Winfield, Ian Oceanside, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00