Steel material for line pipes, method for producing the same, line pipe, and method for producing the line pipe

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227814
APP PUB NO 20220220574A1
SERIAL NO

17440952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel material for line pipes has a specific composition. The metallic microstructure of the steel material at a ⅛-plate thickness position below the surface includes bainite of an area fraction of 85% or more, polygonal ferrite of an area fraction of 10% or less, and martensite-austenite constituent of an area fraction of 5% or less. The 0.23% compressive strength of a portion of the steel material which extends from the surface to the ⅛-plate thickness position in a transverse direction is 340 MPa or more. The temperature at which a percent ductile fracture of the steel material measured in a DWTT test becomes 85% or more is −10° C. or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JFE STEEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muraoka, Ryuji Tokyo, JP 4 9
Shimamura, Junji Tokyo, JP 46 202
Yasuda, Kyono Tokyo, JP 10 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00