Processes and systems for formation of recycle-content hydrocarbon compositions

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227710
APP PUB NO 20220380692A1
SERIAL NO

17755347

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processes and systems for making recycle content hydrocarbons, including olefins, from recycled waste material. Recycle waste material may be pyrolyzed to form recycle content pyrolysis oil composition (r-pyoil), at least a portion of which may then be cracked to form a recycle content olefin composition (r-olefin). The r-olefin may then be further separated into product streams in a separation zone downstream of the cracker furnace. In some cases, presence of recycle content hydrocarbons may facilitate more efficient operation of one or more distillation columns in the separation zone, including the demethanizer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EASTMAN CHEMICAL COMPANY200 SOUTH WILCOX DRIVE KINGSPORT TN 37660

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bitting, Daryl Longview, US 94 364
Polasek, Michael Gary Longview, US 62 345
Slivensky, David Eugene Tatum, US 91 358
Wu, Xianchun Longview, US 100 462

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00