Paper wrapping materials and method for a highly compressed product

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227682
APP PUB NO 20230303889A1
SERIAL NO

18028604

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Paper wrapping materials and method to securely wrap a rolled-up High Expansion Force product. The materials include a kraft paper layer encircling a circumference of the product with a leading end of the paper layer adhered to a tail end of the product by a first hotmelt adhesive. A tail end of the paper layer is adhered to a middle portion of the paper layer with a second hotmelt adhesive encircling the product. The paper layer has: (i) a Basis Weight from about 68 pounds per 3000 feet squared to about 84 pounds per 3000 feet squared, (ii) a Tensile Strength (MD) from about 55 pounds per inch to about 70 pounds per inch, (iii) a Stretch (MD) from about 7% to about 11%, and (iv) a fiber content of at least 70% virgin fibers. The second hotmelt adhesive is between about 15% and about 25% thermoplastic elastomer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • C3 CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuffel, Alex N Appleton, US 5 0
Van, De Hey Joseph F Kaukauna, US 6 51
VanHandel, Jeffery J Freedom, US 5 0
Zirbel, Alex M Kaukauna, US 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00