Compressed member for electrochemical device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227603
APP PUB NO 20220306781A1
SERIAL NO

17596480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A member to be compressed for an electrochemical device obtained by crosslinking a crosslinkable composition containing a fluorine-containing elastomer containing a unit based on at least one crosslinkable group-containing monomer selected from the group consisting of a crosslinkable group-containing monomer (1) represented by the general formula (1):

description='In-line Formulae' end='lead'CX12═CF—Rf1—X2 description='In-line Formulae' end='tail'

    wherein each X1 independently represents H or F, and Rf1 represents a fluorinated alkylene group or a fluorinated oxyalkylene group, and X2 represents I or Br; and a crosslinkable group-containing monomer (2) represented by the general formula (2):CX32═CX3—Z1—CX3═CX32 wherein each X3 independently represents H, F, an alkyl group or a fluorinated alkyl group, and Z1 represents an alkylene group, a fluorinated alkylene group, a cycloalkylene group, a fluorinated cycloalkylene group, an oxyalkylene group or a fluorinated oxyalkylene group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DAIKIN INDUSTRIES, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furutani, Takahiro Osaka, JP 50 172
Irie, Masaki Osaka, JP 41 113
Kamiya, Yusuke Osaka, JP 60 293
Shiomi, Keisuke Osaka, JP 4 0
Takemura, Kouhei Osaka, JP 51 258
Yamaguchi, Riku Osaka, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00