Fiber cement products and methods for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227456
APP PUB NO 20220363602A1
SERIAL NO

17641157

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to fiber cement products comprising a first layer, which first layer is covered by at least one second layer, characterized in that said first layer is the top layer and the first layer material has a density of between about 0.4 and about 0.9 g/cm3 inclusive, and at least comprises cement and between 1 wt % and 70 wt % (relative to the total dry weight of said first layer material) of a lightweight filler, and said at least one second layer is the bottom layer and covers only one of the main surfaces of the first layer, thereby forming a bi-layered fiber cement product, wherein the second layer material has a density of between about 0.9 and about 1.4 g/cm3 inclusive, and at least comprises fibers and cement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ETEX SERVICES NV; ETEX BUILDING PERFORMANCE INTERNATIONAL SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bordin, Ruben Mechelen, BE 7 1
Soulhat, Julien Avignon, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00