Razor wire container with access opening

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227332
APP PUB NO 20190308771A1
SERIAL NO

16369519

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A razor wire barrier or container is disclosed. In some embodiments, the razor wire container includes a plurality of walls defining an interior area for securing object(s) therein. The razor wire container may further include panels or razor wire along a frame defined by the plurality of walls, and a component receptacle extending along the frame. The razor wire container may include a movable access component to provide access to the object(s). The component receptacle is operable to receive a component of a machine for moving the frame. In some embodiments, the component receptacle is a hollow member operable to receive a forklift prong. In some embodiments, the section of razor wire includes one or more panels of razor wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ALLIED TUBE & CONDUIT CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Howe, William Tyler Worcester, US 7 28
Samara, Carmen Homer Glen, US 6 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00