Air taxi pod terminals and methods
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Feb 18, 2025
Grant Date -
Apr 20, 2023
app pub date -
Oct 19, 2021
filing date -
Oct 19, 2021
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An air-taxi pod system floats on a lake, river, sea, etc. and has a spoke connected between a base and an air pod. The pod is configured as a landing region for air taxi within larger metropolitan cities. Each of the spoke, base, and pod use a hull section to provide the buoyancy necessary for each of these components to float. In some versions, two or more, such as six spokes sit around a base connected to the base with connections that can withstand heavy storms. An air pod or separately an air-ship pod connect to some of the spokes at second ends of the spokes with a similar connection. The system can also have terminals or terminal buildings to facilitate travel or commuting.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- Assignment data not available. Check PTO
International Classification(s)

- 2021 Application Filing Year
- E01F Class
- 164 Applications Filed
- 80 Patents Issued To-Date
- 48.79 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bastiyali, Tarkan | New York, US | 25 | 31 |
# of filed Patents : 25 Total Citations : 31 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- E01F Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 18, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 18, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 18, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
