Powered arm lifter system and method of automating weight distribution

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12227041
APP PUB NO 20230070869A1
SERIAL NO

17827487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for powered trailer weight distribution having a hitch mount with a spring bar, and a trailer with a spring bar mount disposed on the trailer and having an initial position relative to the trailer, wherein the spring bar mount is configured to receive and engage the spring bar, and a weight distribution actuator configured and arranged to adjust a position of the spring bar mount relative to the spring bar while engaged with the spring bar, wherein the weight distribution actuator is connected to a power source that provides power to the weight distribution actuator, facilitating the adjustment of the position of the spring bar mount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PROGRESS MFG. LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Jed K Lindon, US 15 108
Harper, Jason R Spanish Fork, US 9 14
Lundgreen, David F Spanish Fork, US 8 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00