Transport system, control method for transport system, and non-transitory computer-readable medium for transport system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12226918
APP PUB NO 20240033931A1
SERIAL NO

18018556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a technique of transporting an object to be transported to a machine tool more securely. A transport system includes a transport path, and a storage portion. The storage portion stores an object, and has a first reference shape. The transport system includes machine tools, and a transport device that moves on and the transport path and transports an object. The control unit executes a process of making a camera photograph the first reference shape to acquire a first image from the camera, and a process of correcting a control parameter to be used in transporting an object to be transported stored in the storage portion to the machine tool that is a transport destination on the basis of a position of the first reference shape in the first image.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DMG MORI CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ota, Shigenobu Nara, JP 1 0
Yamaoka, Shinya Nara, JP 4 9
Yasuda, Hiroshi Nara, JP 375 4422
Yoda, Tomoaki Nara, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 18, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00