Optical element driving mechanism with piezoelectric driving assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12224684
APP PUB NO 20230275530A1
SERIAL NO

17866190

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical element driving mechanism is provided in the present disclosure, including a fixed portion, a movable portion that is connected to an optical assembly, and a driving assembly that drives the movable portion to move relative to the fixed portion and includes a piezoelectric element. The piezoelectric element includes a piezoelectric unit, a guiding element, and a counterweight element. A first end of the guiding element is connected to the piezoelectric unit, and a second end is connected to the fixed portion. The counterweight element is connected to the piezoelectric unit. The fixed portion comprises a bottom that has a first through hole and a second through hole. The first through hole corresponds to the piezoelectric unit and the counterweight element, accommodates a part of the piezoelectric unit and the counterweight element. The second through hole corresponds to the guiding element, accommodates the second end of the guiding element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TDK TAIWAN CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Shu-Shan Taoyuan, TW 111 438
Cheng, Pai-Jui Taoyuan, TW 33 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00