Stator of rotary electric machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12224634
APP PUB NO 20230105198A1
SERIAL NO

18063928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a stator includes a stator core with slots, and multi-phase segment coils each including coil segments each including a first linear part and a second linear part arranged in different slots and a bridge part, the coil segment formed of a rectangular conductor. An innermost coil segment in the slot is structured with divided segments adhered together. Each divided segment includes a first linear part and a second linear part, and a bridge part, and is formed of a rectangular conductor cross-sectional area of which is smaller than the rectangular conductor of other coil segments. The bridge parts of the divided segments are arranged to cross each other in the radial direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA; TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Awazu, Minoru Yokohama Kanagawa, JP 11 116
Kano, Masaru Novi, US 16 35
Makino, Hiroaki Fuchu Tokyo, JP 76 487
Matsushita, Makoto Fuchu Tokyo, JP 118 577
Toi, Takahiro Yokohama Kanagawa, JP 4 6
Yasui, Kazuya Houston, US 28 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00