Bus bar assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12224538
APP PUB NO 20240170898A1
SERIAL NO

18429777

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bus bar assembly is provided and includes a first linking bus bar, a second linking bus bar and plural power connectors. The first linking bus bar includes a first main bar, a first bending part and a first conducting part. The first bending part connects between the first main bar and the first conducting part. The second linking bus bar is disposed corresponding to and isolated from the first linking bus bar, and includes a second main bar, a second bending part and a third conducting part. The second bending part connects between the second main bar and the third conducting part. The power connectors are electrically coupled with the first main bar and the second main bar, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DELTA ELECTRONICS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Ching-Tang Taoyuan, TW 19 89
Ho, Chi-Shou Taoyuan, TW 8 3
Su, Chen-Chiang Taoyuan, TW 9 21
Yin, Guan-Chen Taoyuan, TW 13 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00