High frequency assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12224476
APP PUB NO 20220393331A1
SERIAL NO

17775961

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-frequency assembly includes a cable with at least one dielectric waveguide fiber with a first end and an opposed second end. The high-frequency assembly includes a high-frequency circuit and an interface unit. The at least one dielectric waveguide fiber is at the first end operatively coupled with the high-frequency circuit via the interface unit. The interface unit is designed to inject a high-frequency signal into the dielectric waveguide fiber and/or to receive a high-frequency signal from the at least one dielectric waveguide fiber at the first end. The high-frequency signal has a first signal component of a first polarization direction and a second signal component of a second polarization direction, wherein the high-frequency assembly is designed to inject the first signal component and the second signal component in a defined manner and/or to split a received high-frequency signal into the first signal component and the second signal component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUBER & SUHNER AG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hügel, Ulf Herisau, CH 9 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00