Current sensor assembly and inverter assembly having a plurality of sensors

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12222366
APP PUB NO 20230142008A1
SERIAL NO

17919644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current sensor assembly includes a housing; a plurality of shields which are accommodated inside the housing and open toward the top of the housing; a plurality of bus bars to which three-phase current is applied and which are arranged spaced apart from each other so as to go past the plurality of shields, respectively; and a current sensor unit which includes a printed circuit board and a plurality of current sensors disposed on the printed circuit board to measure the current applied to the bus bars. The shields, the bus bars, and the current sensor unit are configured to be accommodated inside the housing, and the current sensors are spaced apart from the bus bars and disposed in the inner spaces of the shields.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG MAGNA E-POWERTRAIN CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Sungjin Seoul, KR 303 1065
Park, Kyusung Seoul, KR 24 155
Sim, Somi Seoul, KR 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00