Modular pressurized coal combustion (MPCC) for flexible generation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12222101
APP PUB NO 20210025585A1
SERIAL NO

16938725

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular combustion system for flexible energy generation is provided. The system comprises a plurality of combustion boilers, at least one oxidizer supply unit providing an oxidizer stream to the combustion boilers, at least one feeder to provide fuel to the combustion boilers, at least one particle removal unit to remove particles from a flue gas output stream from the combustion boilers, and a pollution removal unit to remove pollutant gases from the flue gas output stream. A process for flexible energy generation using the modular combustion system is disclosed that includes providing an oxidizer stream to a plurality of combustion boilers with at least one oxidizer supply unit, providing fuel to the plurality of combustion boilers with at least one feeder, removing particles from a flue gas output stream from the plurality of combustion boilers with at least one particle removal unit, and removing pollutant gases from a particle-free flue gas output stream with at least one pollution removal unit. A system for controlling wall heat flux in a pressurized coal combustion environment is disclosed that includes at least one burner; and at least one low-mixing, axial-flow boiler.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WASHINGTON UNIVERSITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Axelbaum, Richard St. Louis, US 5 6
Verma, Piyush St. Louis, US 11 80
Yang, Zhiwei St. Louis, US 66 461

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00