Hydro bushing

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12222015
APP PUB NO 20230332667A1
SERIAL NO

17973053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydro bushing includes an outer pipe, an inner pipe disposed within the outer pipe and spaced apart from the outer pipe, an elastic body disposed between the outer pipe and the inner pipe and provided with a liquid chamber portion accommodating liquid therein, and a nozzle disposed between the outer pipe and the elastic body and including a stopper extending toward the liquid chamber portion such that a portion of an internal surface of the nozzle protrudes to be in contact with the liquid chamber portion. A contact end of the stopper is formed to have a surface corresponding to deformation of the elastic body caused by conical movement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HYUNDAI MOTOR COMPANY; KIA CORPORATION; PYUNG HWA INDUSTRIAL CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Jae Hyeok Daegu, KR 30 88
Jo, Gi Bong Seoul, KR 3 3
Ju, Young Bin Daegu, KR 2 1
Kim, Young Ho Gunpo-si, KR 253 3236
Lee, Ho Sung Daegu, KR 27 94
Park, Chan Hee Anyang-si, KR 25 47
Ryu, Yong Hyun Seoul, KR 5 3
Sung, Dae Un Incheon, KR 13 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00